From:                              route@monster.com

Sent:                               Thursday, April 07, 2016 11:54 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Ron Aldred 

Last updated:  06/05/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Crosby, TX  77532
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Ron Aldred - Project Scheduler

Resume Value: tkupthf9cztphadm   

  

 

Ronnie D. Aldred             
1200 Deats Rd.
Dickinson, Texas 77539
Cell Phone 832-561-1879

Email: rdagalveston@live.com

Resume

 

Objective:
 Challenging position utilizing education and strong professional background with opportunity 
 for advancement.

Qualifications Summary:
 Extensive experience in planning, building and installing mechanical systems with piping,     
 vessels, pumps and structural steel in operating petrochemical process facilities at
 supervisor and management level.

 Proven capabilities on personal computer in use of Primavera (P6),  SAP, Microsoft Access,  
 Excell, Word.

 Well organized with the ability to solve problems and stream line procedures for increased
 efficiency.

 Effective working independently or in a team approach. Proficient under challenging conditions
 and consistent in meeting deadlines. Quick to accept and adapt to new responsibilities.
 Aggressive toward completing assigned tasks.

Skilled in communication and interpersonal  relations. Outgoing, enthusiastic and diplomatic,
 able to establish rapport with people of diverse backgrounds at all levels.

Experience and Skills:
 Eleven years experience in all phases of pipe fabrication and erection in the chemical and
 petro chemical industry at craftsman level.

 Two years experience in supervision of a pipe fabrication shop with a man power peak
 of thirty men.

 Five years experience in management, as a planner, scheduler, estimator with a projects
 group with a manpower peak of 80 men.

 Forteen years experience in management, as a Sr. project, planner scheduler for a
 construction company with 150 plus million per year gross contracts.

 Seven years experience in management as a maintenance/ turnaround planner for a local
 petrochemical plant.

Work Experience:

2014 to 2015 : Complete Technical Services

Title: Planner / Scheduler

Duties: Building and maintaining project schedules in P6, using historical data and drawings. Building and maintaining project curves and reports used to update and status the projects.

2012 to 2014 : Jacobs Engineering, Houston Texas

Title: Capital Projects Scheduler

Duties: Building and maintaining project schedules in P6, using data from the project planner.

Building and maintaining the project curves and reports used to update and status the projects.

2000 to 2012 : Infinity Construction Services,  Clute Texas

 Title:  Sr. Project Controls Specialist
 Duties: My position involved reviewing blueprints, interfacing with project superintendents,
 estimators and sub contract labor to gather information needed to produce computer generated
 critical path, resource loaded, pdm schedules for hard dollar and cost plus projects, using
 primavera software. After completing the schedule I was responsible for tracking the progress
 of the project through the corporate standard reports. These reports would include a schedule
 synopsis, summary schedules, s-curves, planned vs earned report & 3 week look ahead. I compare
 the target schedule to the current schedule to determine the schedule performance indicator
 (SPI). I also compare the actual man hours to the earned manhours to determine the cost
 performance indicator (CPI). Information to status the schedule is gathered from the field
 crews.                              
 I developed and documented a cost control process that I have been using in a world class
 ethylene facility at a local refining company. I used the process to create budgets, track
 cost and project final cost for three turnarounds totaling 50 mil.
 My latest assignment was lead scheduler on a 200 mil maintenance/capital project shut down at
 a large local petro/chemical refinery.

1992 to 2000: Equistar Chemical, Laporte Texas

Title: Maintenance / Turnaround Planner

Duties: As a t/a planner I was responsible to review each maintenance job respective to my
 area. I would determine the most cost effective repair procedure by using all available
 resources. This would involve using the existing plant maintenance file, talking to
 knowledgeable individuals and personal past experience. I would record the procedures into
 the plant CMMS system. I would then acquire materials necessary to complete the job. I would
 prepare the bid proposal, and request a bid meeting through the purchasing department. I would
 also host and direct the bid meeting with vendors associated with my work. I would write all
 labor requisitions necessary for the third party labor. I would create the logic diagrams to
 represent the chronological order of the work. This information was forwarded to a scheduling
 group who produced the pdm schedule. Once the t/a was in progress I was responsible to gather
 the status information used to chart the progress of the outage.
 As a maintenance planner my duties were very similar to the t/a planning except the jobs were
 more of a daily nature. 
 As a maintenance co-ordinator my duties were to act as the primary contact between the
 maintenance department and the production department to put together the daily maintenance
 schedules for unit I was assigned to. 
 Accomplishments:
 I was directly involved in planning and executing three large turnarounds.

 

1991 to 1992  U.S. Contractors Inc,  Clute Texas

 Title: Corporate Planner Scheduler
 Duties: Review blueprints, interface with project superintendents and estimators to gather
 information needed to produce computer generated critical path, resource loaded, pdm schedules
 for hard dollar projects, using primavera software.
 Status current schedules.
 Monitor actual cost and compare to completed work, chart this data to establish the following:
 1. productivity rate
 2. current manpower requirements
 3. projected manpower requirements
 4. overall job progress
 Accomplishments:
 Established, standardized and documented:
 1. scheduling procedures
 2. schedule budgeting system
 3. status reporting for schedule

1986 to 1991 Austin Industrial, Houston  Texas

 Title: Planner Scheduler
 Duties: Quality control involving the work that our group installed. Cost estimating all pipe
 and structural steel jobs. Schedule and track all projects. Write job scopes using engineer
 drawings. Planned and scheduled all shutdowns utilizing C.P.M. and bar charts to organize the
 work, load manpower and track progress. Interface with design engineers and drafting personnel
 to address problems prior to involving the mechanical people. Draw and field verify pipe
 isometrics. Use process PID to spec and purchase material.
 Accomplishments:
 Built a system for estimating and scheduling small projects on lotus 123.
 Planned and executed numerous small turnarounds.
 

1984 to 1986  Austin Industrial, Houston  Texas

 Title: Supervisor
 Duties: Pipe fab shop supervisor, supervise all aspects of an on site pipe fab shop attached
 to the capital projects group. I was responsible for the safety, productivity and product
 quality of a shop with a peak of thirty men.


1973 to 1984 Brown & Root Inc., Houston Texas

Locations:  2.5 years Champion Paper
2.5 years Shell Oil
3 years Amoco Oil
3 years Soltex (plastics)
Title:  Pipe fabricator / fitter
Duties  Pipe fabrication and erection at craft level

 

 

 

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Project Scheduler

Jacobs Engineering Company

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

None

 

 

Target Job:

Target Job Title:

Project Scheduler

Desired Status:

Full-Time

 

Target Company:

Company Size:

Occupation:

Engineering

·         General/Other: Engineering

Logistics/Transportation

·         General/Other: Logistics/Transportation

Project/Program Management

·         Program Management

 

Target Locations:

Selected Locations:

US-TX-Houston

Relocate:

No